Do You Handle the Entire Monument Sign Process, Including Design, Engineering, Permits, Fabrication and Installation?
Architectural Signs coordinates monument projects from site review and design through fabrication and installation. The proposal defines the exact scope, including required engineering, permitting, electrical work, and other qualified specialty trades.

For most monument-sign projects, the goal is to make the process as close to turnkey as practical.
A custom monument can involve far more than simply manufacturing a sign cabinet.
There may be site evaluation, conceptual design, sign-code research, landlord approvals, structural engineering, electrical requirements, fabrication, masonry, foundations, installation and inspections.
Trying to coordinate all of those pieces independently can become a second job.
Architectural Signs’ existing exterior-sign materials describe a process that runs from concept through installation and specifically addresses permitting considerations, electrical needs and foundation requirements. The company has also documented projects where its scope included fabrication, masonry construction, site coordination and installation.
That said, the exact scope is determined by the project and jurisdiction.
Some work may be performed directly by Architectural Signs, while engineering, electrical, masonry or specialty work may involve qualified outside professionals.
Here is what the process typically looks like.
Step One: Understand the Property
Before designing the monument, we want to understand the site.
That normally means collecting:
- Property address
- Site photographs
- Architectural elevations
- Proposed sign location
- Existing signage
- Landscaping
- Road orientation
- Approximate viewing distances
If architectural plans or civil drawings are available, those can be extremely useful.
The site drives the design.
Bring the property and design together first.

Early decisions connect the desired appearance to the site’s practical requirements.
Step Two: Review the Sign Requirements
The property may be subject to several layers of rules.
These can include:
- Municipal sign code
- Zoning
- Planned-development standards
- Landlord sign criteria
- HOA requirements
- Architectural review standards
- Utility restrictions
We want those requirements identified early.
Designing first and checking the rules later is backward.
Step Three: Conceptual Design
Now we can begin developing the sign.
We evaluate:
- Overall scale
- Shape
- Brand identity
- Typography
- Materials
- Colors
- Dimensional features
- Illumination
- Relationship to the architecture
Often we can place a conceptual sign into a photograph of the actual property.
That is much more useful than looking at the sign floating by itself on a white page.
It allows the client to evaluate scale and context.

Translate the approved design into fabrication.
The structure, finishes, dimensional elements, and lighting must come together as one assembly.
Step Four: Approvals
Most monument projects have more people involved than just the sign company and customer.
A developer may need owner approval.
A tenant may need landlord approval.
An HOA board may need to vote.
An architect may need to review finishes.
The municipality may need to review the final design.
Getting the right people involved before fabrication keeps revisions inexpensive.
Step Five: Engineering
When structural engineering is required, the design needs to move from appearance to construction.
The engineer may determine or verify:
- Structural framing
- Foundation
- Posts
- Anchors
- Wind resistance
- Connection details
Where locally adopted, the International Building Code’s sign provisions address construction documents and structural loads. Confirm the adopted code, applicable edition, and required documentation with the jurisdiction.
Engineering requirements vary by jurisdiction and project.
Step Six: Permitting
Permit packages can include:
- Site plans
- Sign elevations
- Dimensions
- Construction details
- Engineering
- Electrical information
- Owner authorization
- Fees
Some projects move quickly.
Others require corrections or additional approvals.
We address permitting early because it is one of the least controllable pieces of the schedule.
A coordinated project connects the right people.

The proposal establishes who performs, coordinates, or contracts each part of the work.
Step Seven: Fabrication
Once the project is approved, the design becomes a physical object.
Fabrication can involve:
- CNC routing
- Welding
- Aluminum fabrication
- Structural steel
- Painting
- Powder coating
- Acrylic fabrication
- Dimensional letters
- LED systems
- Masonry components
- Stone
- Graphics
- Electrical assembly
Architectural Signs has been producing custom exterior and interior signage for decades and specifically identifies dimensional monument signs as one of its primary specialties.
Step Eight: Site Preparation
Before installation, we coordinate what needs to happen at the property.
This may include:
- Utility locating
- Existing sign removal
- Excavation
- Foundation work
- Electrical preparation
- Concrete work
- Landscape coordination
- Access planning
Large signs may require special equipment.

Coordinate the sign with the property.
Site preparation, architecture, sign placement, and finishing work all contribute to the final result.
Step Nine: Installation
Installation can be a one-stage or multi-stage process.
For some monuments, the foundation is installed first.
The structure follows after the concrete has reached the appropriate condition.
Masonry may happen before or after other components depending on the design.
Electrical connection may require another trade or inspection.
The installation plan should be determined before the sign arrives on the truck.
Who Is Responsible for Specialty Trades?
This deserves a straightforward answer.
A monument project may require services that legally must be performed or stamped by qualified professionals.
That can include structural engineering or licensed electrical work.
Depending on the project, those parties may be contracted directly or coordinated as part of the broader sign package.
We establish that scope during the proposal process so everyone understands what is included.
The installation begins before the truck arrives.

Foundations, masonry, sign placement, and electrical work may occur in separate stages.
What If the Sign Is Outside Colorado?
Architectural Signs also manufactures signs for customers beyond Colorado and has historically shipped interior signage nationally and internationally. For exterior projects outside the local installation area, fabrication, shipping and coordination with local installation resources may be a more practical model.
One Point of Responsibility Is Valuable
The reason clients prefer a coordinated process is simple.
When the designer, fabricator, engineer and installer operate in isolation, it becomes easy for each party to assume someone else handled an important detail.
A coordinated sign program reduces those gaps.
A monument sign is a small construction project. Treating it that way—from site review through installation—usually results in fewer surprises, better pricing decisions and a finished sign that actually matches what was approved on paper.