Do I Need a Permit for a Monument Sign?

In most communities, yes. Requirements depend on the property’s jurisdiction, zoning, sign design, and illumination. Confirm municipal requirements and any landlord or HOA approvals before fabrication.

Stonegate North community monument signage
Stonegate North community monument signage. Explore the work ↗

Check the approvals before building.

  1. 01 Property

    Confirm jurisdiction, zoning, location, and private sign criteria.

  2. 02 Design

    Check area, height, setbacks, sightlines, and lighting.

  3. 03 Documentation

    Prepare drawings, authorization, and engineering as required.

  4. 04 Approval

    Obtain required permits and approvals before fabrication.

Municipal requirements and owner or HOA approvals are separate. The property’s jurisdiction determines the permit requirements.

In most communities, the answer is yes.

A permanent monument sign is normally regulated by the city, town, county or other authority having jurisdiction over the property.

Exactly what permit is required—and what information must be submitted—depends on where the sign will be installed.

That last part is important.

There is no universal monument-sign code.

A sign that is perfectly legal in Denver might not comply with the rules in another Colorado municipality. Two commercial properties across the street from each other could even fall under different zoning or development standards.

Before fabricating a monument sign, the applicable requirements should be researched.

Why Are Monument Signs Regulated?

A monument sign is a permanent structure located near streets, sidewalks, parking areas and other public spaces.

Local jurisdictions generally regulate signs for several reasons, including:

  • Structural safety
  • Traffic visibility
  • Property setbacks
  • Sign size
  • Height
  • Illumination
  • Electrical safety
  • Architectural appearance
  • Zoning
  • Number of signs allowed on a property

Most municipalities incorporate sign regulations into either their zoning code, development code or a separate sign ordinance.

The International Sign Association notes that most communities require permits for new signs and that the permit process is intended to determine whether a proposed sign is legal for the location.

Visual guide 1 / 3

One project can have several approval paths.

One project can have several approval paths.

Confirm which paths apply to the property. Public permits and private approvals serve different purposes.

What Does the Sign Code Usually Control?

One of the first things we determine is what type of sign the municipality considers the proposed monument to be.

The terminology may vary.

It may be called a monument sign, freestanding sign, ground sign or detached sign.

Once the classification is established, the code may specify the maximum allowable sign area.

That does not necessarily mean the overall width multiplied by the overall height. Every jurisdiction has its own method for calculating sign area.

The code may also regulate maximum height.

Some jurisdictions favor lower monument signs while limiting taller pole or pylon signs.

There may also be rules governing how far the monument must be set back from property lines, roads, sidewalks or intersections.

Sight Triangles Can Affect Where the Sign Goes

A monument sign should never interfere with a driver’s view of traffic.

For that reason, many jurisdictions establish clear-vision areas or sight triangles near intersections and driveways.

Even if the sign otherwise complies with the height and area restrictions, its proposed location may be prohibited if it obstructs visibility.

This is one reason we prefer evaluating the actual site before finalizing a monument design.

Moving a sign ten feet on a drawing is easy.

Moving a concrete foundation ten feet after installation is considerably less entertaining.

Concept illustration of site plans, sign elevations, and project documents on a planning desk.
Concept illustration

A complete submission tells one clear story.

Location, dimensions, construction details, and owner authorization may all be part of the permit package.

Does the Sign Need Engineering?

Possibly.

Some jurisdictions require engineered structural drawings for certain freestanding signs.

Requirements may depend on:

  • Height
  • Sign area
  • Weight
  • Foundation design
  • Construction method
  • Wind loading
  • Soil conditions

An engineer may design or verify the footing, internal structure or attachment method.

If engineering is required, stamped drawings may need to accompany the permit application.

The key is determining that early enough in the project that engineering becomes part of the design rather than an afterthought.

What About Illuminated Monument Signs?

Illumination introduces another layer of requirements.

An electric monument may need electrical permitting in addition to the basic sign permit.

Electric signs are also subject to recognized safety requirements. UL identifies UL 48 as the Standard for Electric Signs, while NEC Article 600 addresses electric signs and outline lighting.

Illumination may also be regulated by the local sign ordinance.

Rules can address brightness, operating hours, light spill and the use of electronic message displays.

A traditional internally illuminated identity sign and an electronic message center may fall under very different provisions of the code.

Visual guide 2 / 3

A permit package connects location to construction.

A permit package connects location to construction.

Submission requirements vary locally. Gather the property information and construction details together.

What If the Property Is Leased?

Municipal approval does not automatically mean landlord approval.

Commercial leases frequently contain sign requirements.

Retail centers and office developments may have comprehensive sign criteria controlling things such as:

  • Colors
  • Letter styles
  • Sign size
  • Approved materials
  • Illumination
  • Logo treatment
  • Location

Some require a landlord or property-management approval letter before the sign permit can even be submitted.

That means there may effectively be two approval processes:

Private approval from the property owner and public approval from the municipality.

Ignoring either can create problems.

HOAs and Planned Developments Can Add Another Layer

Residential communities, office parks and master-planned developments may have architectural review committees.

Those committees can establish standards in addition to municipal requirements.

An HOA entrance monument, for example, may need to satisfy the city sign code while also matching community architecture, landscaping plans and privately adopted design standards.

The most restrictive applicable requirement frequently ends up controlling the design.

Concept illustration of a commercial driveway with a low monument and open views around the entrance.
Concept illustration

The location matters as much as the sign.

Setbacks, sightlines, and property restrictions need a site-specific review. This illustration does not establish an approved location.

What Happens If the Sign Doesn’t Meet the Code?

Sometimes the desired sign simply does not comply with the standard regulation.

That does not always mean the project is dead.

Some jurisdictions have a variance or alternative approval process.

A variance is essentially permission to deviate from a particular code requirement based on the circumstances of the property or proposal.

The International Sign Association notes that variances may sometimes be available for signs that do not meet standard code requirements, although the specific process is determined locally.

Variances should not be treated casually.

They can involve additional documentation, fees, hearings and time.

Whenever possible, it is usually simpler to create an effective sign within the allowable standards.

Can I Replace an Existing Monument Without a Permit?

Do not automatically assume so.

Replacing faces or performing routine maintenance may sometimes be treated differently from constructing a new sign, but regulations vary.

If the sign is being enlarged, structurally modified, relocated or converted to an illuminated sign, additional approvals may be required.

ISA specifically recognizes a distinction between maintenance or upgrading of existing signs and changes that enlarge or substantially transform them, but the actual permit requirement remains a local determination.

When in doubt, verify before construction.

Visual guide 3 / 3

A change to an existing sign deserves a code check.

A change to an existing sign deserves a code check.

Maintenance, re-facing, enlargement, relocation, and lighting changes may be treated differently. Verify locally before work begins.

What Should Be Included With a Monument-Sign Permit?

Requirements vary, but a permit package may include:

  • Application forms
  • Property-owner authorization
  • Site plan
  • Sign location
  • Setbacks
  • Sign elevations
  • Dimensions
  • Construction details
  • Foundation details
  • Structural engineering
  • Electrical information
  • Color renderings
  • Fees

A well-prepared application generally moves through review more smoothly than an incomplete one.

Permit Research Should Happen Before Fabrication

This is the most important point.

Do not fabricate the sign first and ask permission later.

A permit reviewer may require the sign to become shorter, smaller, move to another location or change its illumination.

Those changes are inexpensive when the monument exists on a computer screen.

They become very expensive after steel has been welded, aluminum has been painted and concrete has been poured.

The best monument-sign process begins with three things happening together: site evaluation, design and code research. When those three agree, fabrication can move forward with much greater confidence.

Sources & further reading

City and County of Denver: sign and electrical permit requirements ↗ UL Solutions: electric signs, UL 48, and NEC Article 600 ↗

Permit requirements are property-specific. Confirm the locally adopted code and edition. Denver is a local example, not a statewide rule.